In our last post, we looked at examples in the Lower Mainland of B.C. that are moving from grey to green flood solutions: swapping outdated dikes and top-mounted flood gates for fish-friendly infrastructure and nature-based solutions that protect people and salmon.
B.C. isn’t alone in rethinking how we live with rising waters. Around the world, communities facing their own flood disasters have been experimenting with the same basic idea: giving rivers, floodplains, and coastlines room to do what they naturally do can be just as effective as concrete, and often comes with a much richer set of benefits.
From reconnecting rivers to their floodplains in the Netherlands to slowing waters across an entire watershed in the UK, these projects offer a glimpse of what’s possible when flood management and ecological restoration are treated as complementary goals rather than competing priorities.
In this post, we’ll take a closer look at two international examples, where they came from, what changed, what it cost*, and what it meant for the people and species who depend on these landscapes.

Protective dam and canal In the Netherlands
Room for the River, various locations, The Netherlands
For centuries, the Dutch answer to flooding was the same one most of us default to: build dikes higher, build them stronger, keep the water out. But in 1993 and 1995, that approach came very close to failing. Severe flooding along the Rhine and Meuse rivers inundated farmland and forced the evacuation of a quarter million people and a million animals, and cost more than €400 million in damages. Remarkably, no dikes actually broke during either event, but the near-miss was enough to convince the Dutch government that simply raising the walls higher, over and over, wasn’t a sustainable long-term strategy. Climate change was only going to send more water downstream, not less.
So in 2006, the Dutch government approved something different: Room for the River, a decade-long, €2.3 billion program built on a simple but powerful idea: instead of fighting to keep rivers in tighter and tighter channels, give them more space to flood safely in places where it would do the least harm.
It was, by design, a genuinely multi-level effort. The national government set the overall direction while three national ministries—covering transport and water, agriculture and nature, and spatial planning—worked jointly on the plan. On the ground, 19 partners, including provinces, municipalities, and regional water authorities, carried out the work in their own local contexts. Between 2007 and 2018, that partnership delivered 34 projects across the watersheds of the Rhine, Meuse, Lek, and Waal rivers.
The toolkit looked a lot like what we’ve been advocating for here in B.C.: reconnecting floodplains, relocating dikes further back from the river, deepening side channels, removing or lowering small obstacles like berms, and building dedicated flood bypasses. Crucially, the “room” created for these rivers was designed to remain permanently available, anticipating the higher water volumes climate change is expected to bring in the decades ahead. The program didn’t treat flood safety and ecological health as separate line items. Improving the quality of riverbanks for nature and for people was built into the mandate from the start.
Water experts who’ve watched the country’s rivers change over the life of the program report seeing markedly more room for nature and more thriving natural life along the water’s edge.
Has it actually worked?
The evidence suggests yes! In 2018, high water on the Rhine’s branches passed through without incident, according to the country’s public works agency. The bigger test came in July 2021, when catastrophic flooding tore through Germany and Belgium. Downstream in the Netherlands, water levels stayed significantly lower than they had during past floods of a similar size. Room for the River was credited for the result, allowing the flood wave to naturally spread out and weaken as it moved downstream. Before the project, the Rhine River could safely handle 15,000 cubic metres of water every second during a major flood. Now it can handle 16,000 cubic metres per second of water, a 7 per cent increase. The extra room lowered the height of the flood by one foot, which makes it much less likely to overtop or undermine flood infrastructure during a major flood.
It’s not a perfect story. At a few locations that weren’t widened, floods still caused serious riverbed erosion, damaging infrastructure like ferry landings. It’s a useful reminder that giving rivers room only works where it’s actually been done. Half-measures still leave gaps. But taken as a whole, Room for the River stands as one of the clearest real-world demonstrations that a major flood-prone nation can shift billions of dollars in investment away from ever-higher walls and toward space, and come out safer for it.

Creek remnant in the Biesbosch National Park, Netherlands. Photo: Donar Reiskoffer CC BY 3.0
You can learn about Room for the River at: https://www.rijkswaterstaat.nl/en/projects/iconic-structures/room-for-the-river
Slowing the Flow, North Yorkshire, UK
Not every flood story needs a billion-dollar program to make a difference. One of the biggest lessons comes from a small Yorkshire market town that couldn’t get funding for a conventional flood wall, and ended up building something better instead.
The town of Pickering is located in the county of North Yorkshire, about a four hour drive north of London, England. Pickering Beck, a 29 km, flood-prone river, flows through the centre of the town.
Pickering had flooded again and again: in 1999, 2000, 2002, and 2007, with the 2007 event alone causing an estimated £7 million in damage to the town, part of a brutal £2.1 billion in flood losses across the wider region that year. A standard engineered flood defence plan (dikes, flood gates, etc.) had actually been proposed back in 2004, priced at £6.7 million. But when it was run through a cost-benefit analysis, the numbers didn’t clear the bar for national funding and the plan was shelved. Pickering was left exposed, with no conventional fix available.
So a partnership of researchers, regulators, and land managers tried something different: instead of stopping water at the town’s edge, slow it down before it gets there. Working across the surrounding catchments, covering nearly 70 square kilometres of land, the project built a large flood storage area, installed 167 “leaky” woody dams and 187 heather bale dams in the upland streams, constructed two large wooden dams, planted 44 hectares of new woodland, and reworked farming, moorland, and forestry practices across the catchment – including blocking drains that had been funnelling water off the land and establishing no-burn buffer zones. None of it was designed to stop flooding outright. All of it was designed to buy time, spreading out the rush of water so it arrived in Pickering more slowly and at a lower peak.
The price tag tells its own story: capital costs were roughly £1.15 million, a fraction of what the rejected conventional scheme would have cost. And unlike a flood wall, this investment kept paying dividends well beyond flood control. When experts added up all the benefits over 100 years, not just flood protection, but things like cleaner air, reconnected wildlife habitat, healthier soil, and benefits for the local community, they found the project was worth about £1.9 million more than it cost. Modelling shows the project reduced Pickering’s annual flood risk from a 1-in-4 chance down to less than a 1-in-25 chance.

Pickering, Yorkshire, UK. Showing the extent of the floods in June 2007. Photo: Harkey Lodger CC BY-SA 3.0
And on the nature side: the same ecosystem services assessment valued the natural habitat created by the project at roughly £121,500 a year, with ecosystem services (carbon storage and sequestration, temperature regulation, etc.) worth close to £107,000 annually. Beavers have since been introduced into a nearby fenced catchment to work alongside the leaky dams. Early observations suggest they’re helping stabilize the structures and building even richer wetland habitat in the process, a good reminder that “natural flood management” and “wildlife habitat” tend to be the same thing wearing two different hats.
What Pickering shows, more than anything, is that natural flood management doesn’t have to be the fallback option when a “real” scheme falls through. Done well, upstream, catchment-scale, it can outperform the concrete alternative on cost, flood protection, and nearly everything else.
You can learn more about Slowing the Flow at: https://www.forestresearch.gov.uk/research/slowing-the-flow-at-pickering/
What These Projects Have in Common
Taken together, the Dutch and UK models tell a similar story at two very different scales. Both were born out of crisis rather than foresight, something we are trying not to repeat in the Lower Mainland as we push for a more proactive approach to flood management.
The Netherlands moved to action only after the near-miss floods of 1993 and 1995, and Pickering only after repeated flooding left the community facing an expensive conventional solution it couldn’t afford. In neither case did the shift to nature-based solutions happen because it was the “green” choice. It happened because conventional approaches were proving inadequate, expensive and unsustainable.
And that might be the most important lesson for B.C.
A 2012 provincial study estimated over $9.5 billion just to upgrade dikes in Metro Vancouver. That number has certainly grown with inflation and has not been updated yet.
The underlying issues are identical whether you’re working with a 4,450-hectare polder on the Rhine or a scattering of leaky woody dams in a Yorkshire watershed: slow the water down and give it somewhere to go before it reaches people all at once.
Both projects also show that flood protection doesn’t have to come at the expense of ecological health. Reconnected floodplains can create fish and wildlife habitat. Forests and wetlands can slow floodwaters while storing carbon, improving water quality, and supporting thriving natural diversity. When we design with these functions in mind from the beginning, the same investment can do more than one job.
That’s the opportunity for us right here in B.C.
We don’t have to choose between protecting communities and restoring rivers, floodplains and wetlands. We can design flood infrastructure that does both. And as climate change brings more extreme rainfall and rising flood risk, the question isn’t whether we can afford to rethink how we manage water. It’s whether we can afford not to.
*NOTE: We’ve left costs in euros and pounds as we were unable to find conversion rates true to their costs at the time these projects took place.

Pickering Beck. Photo: JThomas and licensed for reuse under this Creative Commons Licence
Share This Story!
In our last post, we looked at examples in the Lower Mainland of B.C. that are moving from grey to green flood solutions: swapping outdated dikes and top-mounted flood gates for fish-friendly infrastructure and nature-based solutions that protect people and salmon.
B.C. isn’t alone in rethinking how we live with rising waters. Around the world, communities facing their own flood disasters have been experimenting with the same basic idea: giving rivers, floodplains, and coastlines room to do what they naturally do can be just as effective as concrete, and often comes with a much richer set of benefits.
From reconnecting rivers to their floodplains in the Netherlands to slowing waters across an entire watershed in the UK, these projects offer a glimpse of what’s possible when flood management and ecological restoration are treated as complementary goals rather than competing priorities.
In this post, we’ll take a closer look at two international examples, where they came from, what changed, what it cost*, and what it meant for the people and species who depend on these landscapes.

Protective dam and canal In the Netherlands
Room for the River, various locations, The Netherlands
For centuries, the Dutch answer to flooding was the same one most of us default to: build dikes higher, build them stronger, keep the water out. But in 1993 and 1995, that approach came very close to failing. Severe flooding along the Rhine and Meuse rivers inundated farmland and forced the evacuation of a quarter million people and a million animals, and cost more than €400 million in damages. Remarkably, no dikes actually broke during either event, but the near-miss was enough to convince the Dutch government that simply raising the walls higher, over and over, wasn’t a sustainable long-term strategy. Climate change was only going to send more water downstream, not less.
So in 2006, the Dutch government approved something different: Room for the River, a decade-long, €2.3 billion program built on a simple but powerful idea: instead of fighting to keep rivers in tighter and tighter channels, give them more space to flood safely in places where it would do the least harm.
It was, by design, a genuinely multi-level effort. The national government set the overall direction while three national ministries—covering transport and water, agriculture and nature, and spatial planning—worked jointly on the plan. On the ground, 19 partners, including provinces, municipalities, and regional water authorities, carried out the work in their own local contexts. Between 2007 and 2018, that partnership delivered 34 projects across the watersheds of the Rhine, Meuse, Lek, and Waal rivers.
The toolkit looked a lot like what we’ve been advocating for here in B.C.: reconnecting floodplains, relocating dikes further back from the river, deepening side channels, removing or lowering small obstacles like berms, and building dedicated flood bypasses. Crucially, the “room” created for these rivers was designed to remain permanently available, anticipating the higher water volumes climate change is expected to bring in the decades ahead. The program didn’t treat flood safety and ecological health as separate line items. Improving the quality of riverbanks for nature and for people was built into the mandate from the start.
Water experts who’ve watched the country’s rivers change over the life of the program report seeing markedly more room for nature and more thriving natural life along the water’s edge.
Has it actually worked?
The evidence suggests yes! In 2018, high water on the Rhine’s branches passed through without incident, according to the country’s public works agency. The bigger test came in July 2021, when catastrophic flooding tore through Germany and Belgium. Downstream in the Netherlands, water levels stayed significantly lower than they had during past floods of a similar size. Room for the River was credited for the result, allowing the flood wave to naturally spread out and weaken as it moved downstream. Before the project, the Rhine River could safely handle 15,000 cubic metres of water every second during a major flood. Now it can handle 16,000 cubic metres per second of water, a 7 per cent increase. The extra room lowered the height of the flood by one foot, which makes it much less likely to overtop or undermine flood infrastructure during a major flood.
It’s not a perfect story. At a few locations that weren’t widened, floods still caused serious riverbed erosion, damaging infrastructure like ferry landings. It’s a useful reminder that giving rivers room only works where it’s actually been done. Half-measures still leave gaps. But taken as a whole, Room for the River stands as one of the clearest real-world demonstrations that a major flood-prone nation can shift billions of dollars in investment away from ever-higher walls and toward space, and come out safer for it.

Creek remnant in the Biesbosch National Park, Netherlands. Photo: Donar Reiskoffer CC BY 3.0
You can learn about Room for the River at: https://www.rijkswaterstaat.nl/en/projects/iconic-structures/room-for-the-river
Slowing the Flow, North Yorkshire, UK
Not every flood story needs a billion-dollar program to make a difference. One of the biggest lessons comes from a small Yorkshire market town that couldn’t get funding for a conventional flood wall, and ended up building something better instead.
The town of Pickering is located in the county of North Yorkshire, about a four hour drive north of London, England. Pickering Beck, a 29 km, flood-prone river, flows through the centre of the town.
Pickering had flooded again and again: in 1999, 2000, 2002, and 2007, with the 2007 event alone causing an estimated £7 million in damage to the town, part of a brutal £2.1 billion in flood losses across the wider region that year. A standard engineered flood defence plan (dikes, flood gates, etc.) had actually been proposed back in 2004, priced at £6.7 million. But when it was run through a cost-benefit analysis, the numbers didn’t clear the bar for national funding and the plan was shelved. Pickering was left exposed, with no conventional fix available.
So a partnership of researchers, regulators, and land managers tried something different: instead of stopping water at the town’s edge, slow it down before it gets there. Working across the surrounding catchments, covering nearly 70 square kilometres of land, the project built a large flood storage area, installed 167 “leaky” woody dams and 187 heather bale dams in the upland streams, constructed two large wooden dams, planted 44 hectares of new woodland, and reworked farming, moorland, and forestry practices across the catchment – including blocking drains that had been funnelling water off the land and establishing no-burn buffer zones. None of it was designed to stop flooding outright. All of it was designed to buy time, spreading out the rush of water so it arrived in Pickering more slowly and at a lower peak.
The price tag tells its own story: capital costs were roughly £1.15 million, a fraction of what the rejected conventional scheme would have cost. And unlike a flood wall, this investment kept paying dividends well beyond flood control. When experts added up all the benefits over 100 years, not just flood protection, but things like cleaner air, reconnected wildlife habitat, healthier soil, and benefits for the local community, they found the project was worth about £1.9 million more than it cost. Modelling shows the project reduced Pickering’s annual flood risk from a 1-in-4 chance down to less than a 1-in-25 chance.

Pickering, Yorkshire, UK. Showing the extent of the floods in June 2007. Photo: Harkey Lodger CC BY-SA 3.0
And on the nature side: the same ecosystem services assessment valued the natural habitat created by the project at roughly £121,500 a year, with ecosystem services (carbon storage and sequestration, temperature regulation, etc.) worth close to £107,000 annually. Beavers have since been introduced into a nearby fenced catchment to work alongside the leaky dams. Early observations suggest they’re helping stabilize the structures and building even richer wetland habitat in the process, a good reminder that “natural flood management” and “wildlife habitat” tend to be the same thing wearing two different hats.
What Pickering shows, more than anything, is that natural flood management doesn’t have to be the fallback option when a “real” scheme falls through. Done well, upstream, catchment-scale, it can outperform the concrete alternative on cost, flood protection, and nearly everything else.
You can learn more about Slowing the Flow at: https://www.forestresearch.gov.uk/research/slowing-the-flow-at-pickering/
What These Projects Have in Common
Taken together, the Dutch and UK models tell a similar story at two very different scales. Both were born out of crisis rather than foresight, something we are trying not to repeat in the Lower Mainland as we push for a more proactive approach to flood management.
The Netherlands moved to action only after the near-miss floods of 1993 and 1995, and Pickering only after repeated flooding left the community facing an expensive conventional solution it couldn’t afford. In neither case did the shift to nature-based solutions happen because it was the “green” choice. It happened because conventional approaches were proving inadequate, expensive and unsustainable.
And that might be the most important lesson for B.C.
A 2012 provincial study estimated over $9.5 billion just to upgrade dikes in Metro Vancouver. That number has certainly grown with inflation and has not been updated yet.
The underlying issues are identical whether you’re working with a 4,450-hectare polder on the Rhine or a scattering of leaky woody dams in a Yorkshire watershed: slow the water down and give it somewhere to go before it reaches people all at once.
Both projects also show that flood protection doesn’t have to come at the expense of ecological health. Reconnected floodplains can create fish and wildlife habitat. Forests and wetlands can slow floodwaters while storing carbon, improving water quality, and supporting thriving natural diversity. When we design with these functions in mind from the beginning, the same investment can do more than one job.
That’s the opportunity for us right here in B.C.
We don’t have to choose between protecting communities and restoring rivers, floodplains and wetlands. We can design flood infrastructure that does both. And as climate change brings more extreme rainfall and rising flood risk, the question isn’t whether we can afford to rethink how we manage water. It’s whether we can afford not to.
*NOTE: We’ve left costs in euros and pounds as we were unable to find conversion rates true to their costs at the time these projects took place.

Pickering Beck. Photo: JThomas and licensed for reuse under this Creative Commons Licence
Share This Story!
In our last post, we looked at examples in the Lower Mainland of B.C. that are moving from grey to green flood solutions: swapping outdated dikes and top-mounted flood gates for fish-friendly infrastructure and nature-based solutions that protect people and salmon.
B.C. isn’t alone in rethinking how we live with rising waters. Around the world, communities facing their own flood disasters have been experimenting with the same basic idea: giving rivers, floodplains, and coastlines room to do what they naturally do can be just as effective as concrete, and often comes with a much richer set of benefits.
From reconnecting rivers to their floodplains in the Netherlands to slowing waters across an entire watershed in the UK, these projects offer a glimpse of what’s possible when flood management and ecological restoration are treated as complementary goals rather than competing priorities.
In this post, we’ll take a closer look at two international examples, where they came from, what changed, what it cost*, and what it meant for the people and species who depend on these landscapes.

Protective dam and canal In the Netherlands
Room for the River, various locations, The Netherlands
For centuries, the Dutch answer to flooding was the same one most of us default to: build dikes higher, build them stronger, keep the water out. But in 1993 and 1995, that approach came very close to failing. Severe flooding along the Rhine and Meuse rivers inundated farmland and forced the evacuation of a quarter million people and a million animals, and cost more than €400 million in damages. Remarkably, no dikes actually broke during either event, but the near-miss was enough to convince the Dutch government that simply raising the walls higher, over and over, wasn’t a sustainable long-term strategy. Climate change was only going to send more water downstream, not less.
So in 2006, the Dutch government approved something different: Room for the River, a decade-long, €2.3 billion program built on a simple but powerful idea: instead of fighting to keep rivers in tighter and tighter channels, give them more space to flood safely in places where it would do the least harm.
It was, by design, a genuinely multi-level effort. The national government set the overall direction while three national ministries—covering transport and water, agriculture and nature, and spatial planning—worked jointly on the plan. On the ground, 19 partners, including provinces, municipalities, and regional water authorities, carried out the work in their own local contexts. Between 2007 and 2018, that partnership delivered 34 projects across the watersheds of the Rhine, Meuse, Lek, and Waal rivers.
The toolkit looked a lot like what we’ve been advocating for here in B.C.: reconnecting floodplains, relocating dikes further back from the river, deepening side channels, removing or lowering small obstacles like berms, and building dedicated flood bypasses. Crucially, the “room” created for these rivers was designed to remain permanently available, anticipating the higher water volumes climate change is expected to bring in the decades ahead. The program didn’t treat flood safety and ecological health as separate line items. Improving the quality of riverbanks for nature and for people was built into the mandate from the start.
Water experts who’ve watched the country’s rivers change over the life of the program report seeing markedly more room for nature and more thriving natural life along the water’s edge.
Has it actually worked?
The evidence suggests yes! In 2018, high water on the Rhine’s branches passed through without incident, according to the country’s public works agency. The bigger test came in July 2021, when catastrophic flooding tore through Germany and Belgium. Downstream in the Netherlands, water levels stayed significantly lower than they had during past floods of a similar size. Room for the River was credited for the result, allowing the flood wave to naturally spread out and weaken as it moved downstream. Before the project, the Rhine River could safely handle 15,000 cubic metres of water every second during a major flood. Now it can handle 16,000 cubic metres per second of water, a 7 per cent increase. The extra room lowered the height of the flood by one foot, which makes it much less likely to overtop or undermine flood infrastructure during a major flood.
It’s not a perfect story. At a few locations that weren’t widened, floods still caused serious riverbed erosion, damaging infrastructure like ferry landings. It’s a useful reminder that giving rivers room only works where it’s actually been done. Half-measures still leave gaps. But taken as a whole, Room for the River stands as one of the clearest real-world demonstrations that a major flood-prone nation can shift billions of dollars in investment away from ever-higher walls and toward space, and come out safer for it.

Creek remnant in the Biesbosch National Park, Netherlands. Photo: Donar Reiskoffer CC BY 3.0
You can learn about Room for the River at: https://www.rijkswaterstaat.nl/en/projects/iconic-structures/room-for-the-river
Slowing the Flow, North Yorkshire, UK
Not every flood story needs a billion-dollar program to make a difference. One of the biggest lessons comes from a small Yorkshire market town that couldn’t get funding for a conventional flood wall, and ended up building something better instead.
The town of Pickering is located in the county of North Yorkshire, about a four hour drive north of London, England. Pickering Beck, a 29 km, flood-prone river, flows through the centre of the town.
Pickering had flooded again and again: in 1999, 2000, 2002, and 2007, with the 2007 event alone causing an estimated £7 million in damage to the town, part of a brutal £2.1 billion in flood losses across the wider region that year. A standard engineered flood defence plan (dikes, flood gates, etc.) had actually been proposed back in 2004, priced at £6.7 million. But when it was run through a cost-benefit analysis, the numbers didn’t clear the bar for national funding and the plan was shelved. Pickering was left exposed, with no conventional fix available.
So a partnership of researchers, regulators, and land managers tried something different: instead of stopping water at the town’s edge, slow it down before it gets there. Working across the surrounding catchments, covering nearly 70 square kilometres of land, the project built a large flood storage area, installed 167 “leaky” woody dams and 187 heather bale dams in the upland streams, constructed two large wooden dams, planted 44 hectares of new woodland, and reworked farming, moorland, and forestry practices across the catchment – including blocking drains that had been funnelling water off the land and establishing no-burn buffer zones. None of it was designed to stop flooding outright. All of it was designed to buy time, spreading out the rush of water so it arrived in Pickering more slowly and at a lower peak.
The price tag tells its own story: capital costs were roughly £1.15 million, a fraction of what the rejected conventional scheme would have cost. And unlike a flood wall, this investment kept paying dividends well beyond flood control. When experts added up all the benefits over 100 years, not just flood protection, but things like cleaner air, reconnected wildlife habitat, healthier soil, and benefits for the local community, they found the project was worth about £1.9 million more than it cost. Modelling shows the project reduced Pickering’s annual flood risk from a 1-in-4 chance down to less than a 1-in-25 chance.

Pickering, Yorkshire, UK. Showing the extent of the floods in June 2007. Photo: Harkey Lodger CC BY-SA 3.0
And on the nature side: the same ecosystem services assessment valued the natural habitat created by the project at roughly £121,500 a year, with ecosystem services (carbon storage and sequestration, temperature regulation, etc.) worth close to £107,000 annually. Beavers have since been introduced into a nearby fenced catchment to work alongside the leaky dams. Early observations suggest they’re helping stabilize the structures and building even richer wetland habitat in the process, a good reminder that “natural flood management” and “wildlife habitat” tend to be the same thing wearing two different hats.
What Pickering shows, more than anything, is that natural flood management doesn’t have to be the fallback option when a “real” scheme falls through. Done well, upstream, catchment-scale, it can outperform the concrete alternative on cost, flood protection, and nearly everything else.
You can learn more about Slowing the Flow at: https://www.forestresearch.gov.uk/research/slowing-the-flow-at-pickering/
What These Projects Have in Common
Taken together, the Dutch and UK models tell a similar story at two very different scales. Both were born out of crisis rather than foresight, something we are trying not to repeat in the Lower Mainland as we push for a more proactive approach to flood management.
The Netherlands moved to action only after the near-miss floods of 1993 and 1995, and Pickering only after repeated flooding left the community facing an expensive conventional solution it couldn’t afford. In neither case did the shift to nature-based solutions happen because it was the “green” choice. It happened because conventional approaches were proving inadequate, expensive and unsustainable.
And that might be the most important lesson for B.C.
A 2012 provincial study estimated over $9.5 billion just to upgrade dikes in Metro Vancouver. That number has certainly grown with inflation and has not been updated yet.
The underlying issues are identical whether you’re working with a 4,450-hectare polder on the Rhine or a scattering of leaky woody dams in a Yorkshire watershed: slow the water down and give it somewhere to go before it reaches people all at once.
Both projects also show that flood protection doesn’t have to come at the expense of ecological health. Reconnected floodplains can create fish and wildlife habitat. Forests and wetlands can slow floodwaters while storing carbon, improving water quality, and supporting thriving natural diversity. When we design with these functions in mind from the beginning, the same investment can do more than one job.
That’s the opportunity for us right here in B.C.
We don’t have to choose between protecting communities and restoring rivers, floodplains and wetlands. We can design flood infrastructure that does both. And as climate change brings more extreme rainfall and rising flood risk, the question isn’t whether we can afford to rethink how we manage water. It’s whether we can afford not to.
*NOTE: We’ve left costs in euros and pounds as we were unable to find conversion rates true to their costs at the time these projects took place.

Pickering Beck. Photo: JThomas and licensed for reuse under this Creative Commons Licence